Electrical engineering student in Adelaide focused on solar power systems and grid integration, with verified standards-based power design and Australian solar manufacturing experience.
This page exists so recruiters, search engines, and AI agents can extract the same facts a human visitor sees: student and internship target, location, technical strengths, project evidence, public disclosure limits, resume path, and contact path.
Name
Nathan No-ot
Location
Adelaide, South Australia
Current status
Electrical engineering student focused on solar power systems and grid integration
Contact
nathannoott@gmail.com
Target roles
What this portfolio should match
Electrical engineering student placement
Power systems internship
Solar and grid-integration internship
Electrical engineering student opportunity
Strengths
Evidence worth checking
Standards-informed power-system design using AS/NZS 3000, AS/NZS 3008, AS/NZS 4777.2, and SAPN TS132/TS133
Solar manufacturing experience in a Kaizen and 5S production culture
Broader systems work across embedded systems, UAVs, controls, and practical electronics
Technical writing, documentation, DFMA, and evidence-based engineering decisions
Evidence map
Projects with status
Each case study uses a problem, approach, result, and evidence status structure so the claims are easy to inspect before contact.
Technical assessment for connecting a 1 MW solar plant to the SA Power Networks distribution grid: connection voltage, power-quality compliance, protection, and storage, decided against AS/NZS inverter standards and SAPN TS132/TS133.
Standards-traceable 400 V cabling design for a three-tenancy commercial complex: maximum demand, cable selection, earthing, and fault verification to AS/NZS 3000 and AS/NZS 3008.1.1.
400 V
AS/NZS 3000
Cable sizing
Read case study
Disclosure boundary
Public, sanitised, and pending content
Public portfolio content is sanitised. Phone, street address, employer-sensitive process detail, university-restricted material, and defence-related details are omitted unless cleared.
Resume and email contact are public; phone number and street address are intentionally omitted.
Project metrics must be measured, defensible, and safe to publish.
Images support the design, but important claims also appear as text.